Tech Gateway

In December we delivered almost 100 newly ordered gateways. The M-Gates were produced in Berlin and assembled in the laboratory of METR GmbH / Next Big Thing AG.
These gateways will be installed at the beginning of 2019 at a large housing company.
METR thus sold almost 200 M-Gates in 2018. The gateways installed to date read the heat consumption data of over 80 buildings in Berlin and Leipzig. Every two weeks we receive approx. 6300 different measurements.